Charge-out rate
A charge-out rate is typically used to allocate the costs of a resource that is shared among multiple users. In construction, it is often used to calculate fees for a labour resource, taking into account unproductive and non-chargeable hours.
Chargeable hours are those that are spent providing direct services for a client. For example, a consultant may calculate their fee by multiplying the number of hours a particular job will take by a charge-out rate, which enables them to cover their costs. This rate must take into account holidays, sick leave and other non-chargeable work.
There is no fixed method of calculating a charge-out rate, however, a consultant for example, might calculate the annual cost of their labour (including salary, benefits and taxes), plus overhead costs and a profit allowance. Then, the total amount is divided by the total chargeable hours per year to arrive at a charge-out rate.
Tradespeople, such as plumbers or joiners, may charge separately for materials used.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.